Artificial intelligence is often discussed in terms of models, chips, and new applications. Behind each service is a physical infrastructure of data centres, servers, cooling systems, electrical equipment, and networks. As demand for AI computing grows, that infrastructure is becoming an energy and planning issue for utilities, businesses, and communities.
Recent research gives a clearer picture of the scale. BloombergNEF reported on November 11, 2026 that data-centre electricity demand could almost quadruple to 2,354 terawatt-hours by 2035 in its outlook, equivalent to around 7% of global electricity demand. The International Energy Agency (IEA), in a report published October 14, 2026, examined how data centres affect electricity systems, prices, emissions, water use, and grid planning across 34 policy jurisdictions covering about 90% of global data-centre capacity.
This feature explains why AI infrastructure needs so much power, what the pressure means for electricity grids and water resources, and which practical responses are being considered. Forecasts are scenarios, not guaranteed outcomes, and different organisations use different assumptions.
Why AI Infrastructure Uses So Much Electricity
AI workloads run on specialised servers containing processors and accelerators that consume electricity while processing data. Data centres also need power for networking, storage, lighting, cooling, and other supporting systems. The total electricity demand therefore includes more than the chips that perform model calculations.
Demand can rise when organisations train larger models, serve more user requests, generate images or video, or run agents that perform multi-step tasks. The effect depends on model efficiency, hardware utilisation, the number of users, and how often tasks are repeated.
What the Latest Energy Forecasts Say
BloombergNEF’s November 11, 2026 analysis projects that data-centre electricity demand could reach 2,354 TWh by 2035, almost four times the current level in its outlook. The report also tracks 181 GW of announced gas-fired generation proposed alongside data centres, with more than 90% of that announced capacity in the United States. These are projections and announced projects, not confirmed operating capacity.
Gartner’s June 10, 2026 forecast estimated worldwide data-centre electricity consumption at 565 TWh in 2026, up from 447 TWh in 2025. Gartner also estimated that AI-optimised servers would account for 31% of data-centre power consumption in 2026. This is a separate forecast with its own definitions and assumptions, so it should not be added to or directly substituted for BloombergNEF or IEA figures.
Why Electricity Grids Are Under Pressure
Large data centres can require substantial electricity at a concentrated location. If several projects seek connections in the same region, utilities may need to plan substations, transformers, transmission lines, generation, and backup capacity. The equipment and permitting process can take years, while data-centre construction schedules may move much faster.
The IEA’s October 2026 report notes long connection queues, network-capacity limits, and slow permitting in multiple jurisdictions. It also describes how demand visibility matters: project pipelines can include speculative or duplicate proposals, and real electricity use may ramp up gradually as servers and customer workloads come online.
Water, Cooling, and Local Community Impact
Many facilities use cooling systems to keep servers within operating temperatures. The water footprint varies by cooling design, climate, electricity source, and operating conditions. The IEA reports that nearly 40% of identified AI-focused data-centre capacity is in areas with high or extremely high baseline water stress.
Water is not the only local concern. Communities may also ask how a new facility affects electricity bills, land use, noise, air quality, and competition for infrastructure. The IEA notes that the impact on electricity prices is not clear-cut and depends on the local power system, cost allocation, and how the facility interacts with the grid.
What Could Make AI Data Centres More Sustainable?
Improve the efficiency of computing
More efficient chips, models, software, and workload scheduling can reduce the electricity needed for a given task. Measuring efficiency requires a clear unit of useful work; a faster system may still consume more total electricity if usage expands rapidly.
Choose locations carefully
Location influences grid capacity, climate, water availability, connectivity, and access to low-emissions electricity. Planning should consider the full local system rather than selecting a site only because land or power appears available.
Use clean electricity and transparent procurement
Power purchase agreements and new clean-energy projects can support lower-emissions electricity supply. The timing and location of generation also matter: annual renewable certificates alone do not show whether clean power is available at the same time and place as the data-centre load.
Make workloads more flexible
Some non-urgent computing tasks may be shifted in time or between locations, subject to latency, data-governance, and service requirements. The IEA describes non-firm grid connections and flexible operating arrangements as ways to connect some large loads more efficiently, provided the rules are transparent and reliable.
Plan water and energy together
Cooling choices can involve trade-offs. The IEA notes that systems designed to minimise water use may consume more energy, and vice versa. Operators and policymakers therefore need to assess water and electricity use together rather than treating them as unrelated goals.
Who Is Responsible for Managing the Trade-Offs?
There is no single actor responsible for the whole data-centre footprint. Developers choose sites and facility designs; technology companies decide which models and workloads to run; utilities plan grid connections; regulators set rules and cost-allocation frameworks; and local authorities represent community needs. Better reporting on location, electricity use, water, and expected demand can help these groups make informed decisions.
Questions to Ask About a New Data Centre
- How much electricity is the facility expected to use, and when will demand increase?
- What grid upgrades are required, and who pays for them?
- Which electricity sources will serve the facility, and how are emissions measured?
- What cooling system will be used, and what is the local water impact?
- Can some workloads respond to grid conditions without affecting service quality?
- How will the operator report actual performance against its forecasts and commitments?
Frequently Asked Questions
Does every AI request use a large amount of electricity?
No. Energy use varies by model, hardware, task, request length, and data-centre efficiency. A short text query and a large-scale model-training run are very different workloads.
Will AI data centres cause electricity shortages?
Not everywhere. The effect depends on local grid capacity, new generation, storage, demand flexibility, and how quickly infrastructure is built. Some regions may face connection delays or higher costs even when the national system has sufficient total generation.
Are AI data centres powered by renewable energy?
Some operators procure renewable electricity or sign power purchase agreements, but energy sources differ by facility and region. Buyers should examine when and where electricity is generated, not just broad corporate claims.
Why does water use matter?
Water may be used directly in cooling and indirectly in electricity generation. The impact depends on local water stress, cooling technology, and the source of electricity.
Can more efficient AI models solve the energy challenge?
Efficiency can reduce energy per task, but total demand may still grow if the number and complexity of tasks increase. Hardware, software, deployment choices, and energy infrastructure all matter.
Conclusion: AI Growth Needs Infrastructure Planning
The AI boom is also an infrastructure story. Data centres need reliable electricity, cooling, networks, and equipment, while communities need transparent information about costs and local impacts. More efficient computing, better grid planning, clean-energy procurement, flexible workloads, and coordinated water management can help reduce the pressure. The most useful question is not whether AI will use more electricity, but how its infrastructure can grow in a way that is reliable, fair, and environmentally responsible.
Sources and Further Reading
- International Energy Agency: Powering Artificial Intelligence — report published October 14, 2026, covering data-centre integration into electricity systems.
- BloombergNEF: Data Center Power Demand Is Set to Surge, Raising New Climate Challenges — analysis dated November 11, 2026.
- Gartner: Data Center Electricity Consumption to Grow 26% in 2026 — forecast dated June 10, 2026.
Editorial note: Electricity forecasts differ by provider, scenario, time horizon, and the definition of a data centre. Announced generation projects are not the same as operating plants, and corporate sustainability claims should be checked against their stated methodology.

AI Agents: What They Can Do, Where They Fail, and How to Use Them Safely
Agentic Payments Explained: How AI Agents Could Change Digital Transactions
AI Search and Social Search in 2026: How People Discover Information
2027 Consumer Trends: Why People Want AI Convenience Without Losing Control
ChatGPT in 2026: Features, Memory, Projects, Search & How to Use It 